Practice Question: Construction Earth work

NCEES Civil PE Specification Site Development: Construction Earth work


Problem

The following figure shows elevations at each grid corner of an area to be leveled. 

Determine the cut/fill volume of soil required to level the entire area to an elevation of 206 ft.

Assume a linear change in elevation between grid corners.

 

Select an Answer: