NCEES Civil PE Specification Site Development: Safety
Problem
You are planning an excavation to install a new water line and bedding.
A competent person has identified soil at the excavation site as Type A.
Given the excavation dimensions pictured below, what is the minimum horizontal distance \(X_{min}\)?
Select an Answer: