NCEES Civil PE Specification Hydraulics and Hydrology: Open-channel flow
Problem
Water in the open channel pictured flows through a V-notch weir. Given dimensions provided by the elevation view and a discharge coefficient of 2.5, determine the flow over the weir in cubic feet per second.
Select an Answer: