NCEES Civil PE Specification Hydraulics and Hydrology: Storm Characteristics
Problem
Your town's Public Works Department has plans to upsize an old rainfall runoff basin culvert in 5 years.
In order to help the department decide if the project can wait 5 years or needs to be advanced, determine the probability of flooding twice in the next 5 years.
Assume the culvert was originally designed for a storm with a return period of 25 years.
Select an Answer: