Practice Question: Calculating Time to Fill Detention Basin from Ditch Discharge Rate

NCEES Civil PE Specification Hydraulics and Hydrology: Detention/retention ponds


Problem

In a stormwater drainage system, a ditch with a maximum capacity of 8 ft³/sec discharges into a detention basin with a volume of 150,000 gallons. During a storm event, the average discharge into the detention basin is 2.2 ft³/sec. Determine the shortest possible time (in hours) required to fill the initially empty basin.