NCEES Civil PE Specification Project Planning: Project schedules
Problem
The activity-on-node network pictured represents a construction schedule. If the schedule's critical path is dependent on Activities AEG (shown in RED), determine the maximum length of Activity D to the nearest day.

Select an Answer:
 
                    